FLEXITRICITY LIMITED

10 unique locations (115 components)

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Neachley Ln, Shifnal TF11 8PQ (15 components)
• Load reduction on site supported by non-exporting standby generation.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.56 MW
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (16 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2023-24 (T-4) ...
3.60 MW
Meerbrook, Leek, Staffordshire, ST13 8SN (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2023-24 (T-4) ...
3.60 MW
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (14 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.60 MW
Joan Ln, Bamford, Hope Valley S33 0AW (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.56 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (15 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Standby generation
Active • 2022-23 (T-3), 2022-23 (T-4) ...
14.00 MW
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2023-24 (T-4), 2025-26 (T-1) ...
14.00 MW
Deansford Lane, DY10 4NB (13 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.56 MW
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2023-24 (T-4) ...
3.56 MW
Bowland View, Fulwood, Preston, Lancashire PR2 5QT (13 components)

Standby generation

Active • 2023-24 (T-1), 2025-26 (T-4) ...
2.25 MW
Loading map...
Showing 10 locations