Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

568 unique locations (8231 components) - Page 1 of 23

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (9 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2025-26 (T-1) ...
14.00 MW
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (7 components)

Water source heat pumps at 1748kW each

Active • 2028-29 (T-4), 2025-26 (T-1) ...
14.00 MW
Saltend Lane, HULL, HU12 8PP (27 components)
• Load reduction
• Load reduction on site
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Neachley Ln, Shifnal TF11 8PQ (15 components)
• Load reduction on site supported by non-exporting standby generation.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.56 MW
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (16 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Meerbrook, Leek, Staffordshire, ST13 8SN (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
M74 Eco Park, Carlisle Road Lesmahagow ML11 0GU (3 components)

Load curtailment from on-site equipment in response to Flexitricity signal.

Active • 2028-29 (T-4)
7.99 MW
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (14 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Joan Ln, Bamford, Hope Valley S33 0BE (1 component)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4)
3.60 MW
High Street, Edinburgh, EH33 1LP (18 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (15 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.00 MW
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.00 MW
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (39 components)

load curtailment at site

Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.07 MW
Bush Estate, Penicuik EH26 0QA (11 components)
• Load reduction on site supported by standby generation
• Standby generation reducing load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.97 MW
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.56 MW
Bowland View, Fulwood, Preston, Lancashire PR2 5QT (13 components)

Standby generation

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.25 MW
ASDA Wrexham, Holt Road, Wrexham, LL13 8HL (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
Asda Worsbrough, Thomas Street , Worsbrough, S705AU (9 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
4.80 MW
ASDA Woking Sheerwater, Forsyth Road Sheerwater, Woking, GU21 5SE (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
0.02 MW
ASDA Wheatley, London Road, Oxford, OX33 1YZ (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Watford, Odhams Industrial Estate , Watford, WD24 7RT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Waterlooville, Portland Road , Waterlooville, PO7 7XR (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Walton, Utting Avenue , Liverpool, L4 9XU (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Swindon Haydon, Orbital Shopping Park Thamesdown Drive, Swindon, SN25 4YX (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
4.80 MW
ASDA Swansea, Upper Forest Way, Morriston, SA6 8PS (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
4.80 MW
Loading map...
Showing 25 locations