Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

105 unique locations (853 components) - Page 2 of 5

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Chareteris Place Edinburgh EH8 8FN (6 components)

CHP generating for site load, which exceeds generating capacity. No aux load.

Active • 2022-23 (T-4), 2019-20 (T-1)
Chilham MCC, Mill Lane, Chilham, Kent CT4 8EF (8 components)

Standby generation

Active • 2020-21 (T-4), 2017-18 (T-1)
Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (5 components)
• Load curtailment
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
Active • 2023-24 (T-4), 2022-23 (T-3) ...
2.58 MW
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (10 components)
• Load drop.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Combe Park, Bath, BA1 3NG (8 components)
• Standby generation taking site load
• Standby generation x 2
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Cramptons Road Pumping Station, Cramptons Road, Sevenoaks, TN14 5BQ (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Crowhurst Bridge, 62 Shrub Lane, Etchingham, TN19 7EB (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Deepdale Stadium, Sir Tom Finney Way, Preston PR1 6RU (5 components)

Gas CHP in a leisure & business environment providing heat and electricity to function suite and stadium and exporting excess

Active • 2021-22 (T-4), 2018-19 (T-1)
Dock Yard Rd, Ellesmere Port, CH65 4EG (12 components)
• BtM storage as standby generation, non-exporting
• BtM storage providing standby capacity
• BtM storage/standby generation; non exporting
Active • 2023-24 (T-4), 2022-23 (T-3) ...
2.58 MW
Dunswell Road, Cottingham, Hull HU16 4JT (6 components)

Two CHP engines, 1.94MW and 1.46MW (total 3.4MW) in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (7 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (11 components)

Combination of load curtailment and standby generation

Active • 2022-23 (T-4), 2021-22 (T-4) ...
Elphinstone Research Centre, Tranent EH33 2NE (6 components)
• Load drop
• Load drop by on-site generation
Active • 2023-24 (T-4), 2022-23 (T-3) ...
1.29 MW
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (31 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Active • 2020-21 (T-4), 2019-20 (T-1) ...
entre Bailey Road,Central Park, Rugby CV23 0PD (7 components)
• Load curtailment & standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2021-22 (T-4), 2020-21 (T-4) ...
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (10 components)
• CHP generating in NHS hospital. No aux load.
• CHP generating to cover site load, which exceeds generating capacity. No aux load.
Active • 2022-23 (T-4), 2019-20 (T-1) ...
GCHQ, Hubble Road, Cheltenham, GL51 0EX (7 components)

Load reduction

Active • 2020-21 (T-4), 2017-18 (T-1)
George Square Charles St Lane EH8 9AG (5 components)

CHP generating for site load, which exceeds generating capacity. No aux load.

Active • 2022-23 (T-4), 2019-20 (T-1)
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 1HQ (7 components)

Four POSGUs (standby diesel generators) each having 1.4MW capacity.

Active • 2020-21 (T-4), 2017-18 (T-1)
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Hanson Place, Gorrells Way, Rochdale, OL11 2NQ (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Harbour House, Marine Parade Dover Kent CT17 9BU (8 components)
• Multiple POSGUs (standby diesel generators).
• Sixteen POSGUs (standby diesel generators).
Active • 2022-23 (T-4), 2020-21 (T-4) ...
High Dike, Grantham NG32 3QD (8 components)

Load reduction on flexible electricity consuming processes

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations