Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

892 unique locations (10907 components) - Page 35 of 36

Active MW: 665.74 MW
Inactive MW: 2466.63 MW
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (7 components)

Water source heat pumps at 1748kW each

Active • 2028-29 (T-4), 2025-26 (T-1) ...
14.00 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (6 components)

One 2MW gas CHP engine in a horticultural environment

Active • 2027-28 (T-4), 2024-25 (T-1) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (11 components)

2 POSGU (1.0MW and 0.6MW)

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Staithes Road, Washington NE38 8NW (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
St Andrews Road, Kings Weston Lane BS11 9FG (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
Stratford U Avon Maybird - Chelthenham and Worcester CV37 0HZ (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
Stretfield, Derbyshire, S33 9JT (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2021-22 (T-4), 2017-18 (T-1)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (10 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2024-25 (T-4) ...
STW Water Netheridge, Hempstead Lane, Hempstead, Gloucester, GL2 5LF (1 component)

Permitted Onsite Generator located at Waste Water Treatment works

Active • 2025-26 (T-4)
14.00 MW
SUPPLY TO R1, UNIT R1-R8, LYMPNE INDUSTRIAL ESTATE, LYMPNE, HYTHE, CT21 4LR (2 components)

Load drop at large Industrial cold storage

Active • 2020-21 (T-4)
1.02 MW
Sutton Courtenay Rd, Abingdon, OX14 4SE (3 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2021-22 (T-4)
Sutton & East Surrey Water, Shearwater Road, Off Garder Green Lane, Cheam, Surrey SM1 2BY (8 components)

2 x POSGU , each 0.8MW

Active • 2020-21 (T-4), 2017-18 (T-1)
Telford Forge Rp - Shropshire and Cheshire TF3 4AG (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
Thanet Earth 2 Barrow Man Road Birchington Kent CT7 0AX (6 components)

Two CHP engines of 3.0MW and 2.4MW respectively. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (11 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Thearne Lane Woodmansey Beverley HU17 0SA (6 components)

Two gas CHP engines in commercial horticultural environment with no auxilliary load

Active • 2025-26 (T-4), 2023-24 (T-4) ...
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (5 components)

2 x CHP at a horticultural site

Active • 2028-29 (T-4), 2025-26 (T-4) ...
Thearn Lane Woodmansey Beverley HU17 0SA (7 components)

Two gas CHP engines 1.52MW and 1.51MW. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (24 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (20 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Truro Pydar St - West Cornwall TR1 2BD (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (9 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2025-26 (T-1) ...
14.00 MW
Loading map...
Showing 25 locations