Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

105 unique locations (853 components) - Page 4 of 5

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
New Bankside, Abbots Wynd FK2 7XP (1 component)
Inactive • 2022-23 (T-4)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (13 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Paddington Green Campus, London, W2 1NB (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Park Lane Cottingham East Yorkshire HU16 5RX (8 components)

Gas CHP engines in commercial horticultural environment with one 1.3MW engine and one 1.5MW engine plus two 0.95MW gas CHP. Primary fuel type = Natural Gas. No auxilliary load

Active • 2020-21 (T-4), 2017-18 (T-1)
Pipers Way, Swindon, Wiltshire, SN38 1SN (7 components)
• Load curtailment & standby generation
• Load reduction via on-site standby generation taking site load
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (8 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Portsmouth Rd, Frimley, Surrey GU16 7UJ (9 components)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• Standby generation
• Standby generation sub-metered taking site load
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Pudding Lane Spalding, Lincs, PE11 3TJ (9 components)
• Load curtailment and standby generation
• Load curtailment via standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2022-23 (T-4), 2021-22 (T-4) ...
R&H Holt, Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (6 components)

One CHP of 1.0MW. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Riverside House, Main Street, Rotherham S60 1AE (10 components)

Load reduction and generation via standby assets

Active • 2022-23 (T-4), 2021-22 (T-4) ...
Royal Mail Medway, Knight Road, Strood, Rochester, Kent ME2 2JE (6 components)

Standby generation

Active • 2020-21 (T-4), 2017-18 (T-1)
Saddlebow Road, Saddlebow, King's Lynn, Norfolk, PE34 3AG (1 component)

The construction of an peaking plant energy centre, which will house 15 gas engines and may be enhanced in future by battery storage.

Inactive • 2021-22 (T-4)
Seafield Road, Edinburgh EH6 7LQ (23 components)

Standby generation, submetered, taking site load

Active • 2023-24 (T-1), 2022-23 (T-4) ...
1.99 MW
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (11 components)

2 POSGU (1.0MW and 0.6MW)

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Stretfield, Derbyshire, S33 9JT (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2021-22 (T-4), 2017-18 (T-1)
Sutton & East Surrey Water, Shearwater Road, Off Garder Green Lane, Cheam, Surrey SM1 2BY (8 components)

2 x POSGU , each 0.8MW

Active • 2020-21 (T-4), 2017-18 (T-1)
Thanet Earth 2 Barrow Man Road Birchington Kent CT7 0AX (6 components)

Two CHP engines of 3.0MW and 2.4MW respectively. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Thearn Lane Woodmansey Beverley HU17 0SA (7 components)

Two gas CHP engines 1.52MW and 1.51MW. Primary fuel type = Natural Gas

Active • 2020-21 (T-4), 2017-18 (T-1)
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Unit 5 Brown Lane West, Leeds. LS12 6BF (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2020-21 (T-4) ...
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations