Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

892 unique locations (10907 components) - Page 5 of 36

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (14 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.60 MW
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Active • 2022-23 (T-3), 2022-23 (T-4) ...
LADYSMITH ROAD, GRIMSBY, DN32 9EE (5 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Active • 2022-23 (T-1), 2025-26 (T-4)
Knypersley Generator Unit G Forge Way Brownlees Industrial Estate Knypersley Stoke on Trent ST8 7DN (6 components)

Four reciprocating engines 1.7MW and one of 1.6MW capacity. Primary fuel - gasoil

Active • 2017-18 (T-1), 2020-21 (T-4)
Kings Park Road, Moulton Park, Northampton, NN3 6NW (8 components)
• Load curtailment on site and standby generation
• Load reduction on site via standby generation
Active • 2017-18 (T-1), 2020-21 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (19 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2020-21 (T-4), 2021-22 (T-4) ...
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (9 components)

Mix of load reduction and standby generation

Active • 2017-18 (T-1), 2020-21 (T-4) ...
John Milne Ave, Rochdale OL16 4NR (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2021-22 (T-4), 2022-23 (T-4) ...
5.33 MW
Joan Ln, Bamford, Hope Valley S33 6RB (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2021-22 (T-4)
Joan Ln, Bamford, Hope Valley S33 0BE (1 component)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4)
3.60 MW
Joan Ln, Bamford, Hope Valley S33 0AW (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.56 MW
Ide Hill Road, Bough Beech, Edenbridge TN8 7PJ (7 components)

Standby generation

Active • 2017-18 (T-1), 2020-21 (T-4)
Iceland Foods Second Avenue Deeside Industrial Park Deeside Flintside CH5 2NW (9 components)

Mix of load reduction and standby generation

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Iceland Foods Penzance Drive Swindon Wiltshire SN5 7JF (7 components)

Mixture of load reduction and standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Iceland Foods 5 Solar Way Innova Park Brimsdown Enfield EN3 7XY (9 components)

Mix of load reduction and standby generation

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Hunter Boulevard, Magna Park, LE17 4XN (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2021-22 (T-4), 2022-23 (T-4) ...
5.33 MW
HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (6 components)

CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW

Active • 2022-23 (T-1), 2025-26 (T-4)
Hubble Road, Cheltenham, GL51 0EX (6 components)
• Load reduction
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2021-22 (T-4), 2022-23 (T-4)
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (8 components)

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (14 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2023-24 (T-1), 2023-24 (T-4) ...
High Street Waterham Kent ME13 9EJ (6 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
High Street, Edinburgh, EH33 1LP (18 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2022-23 (T-1), 2023-24 (T-1) ...
4.80 MW
High Dike, Grantham NG32 3QD (8 components)

Load reduction on flexible electricity consuming processes

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Hereford - Chelthenham and Worcester HR4 9AA (1 component)

Commercial sites

Active • 2024-25 (T-1)
2.04 MW
Loading map...
Showing 25 locations