FLEXITRICITY LIMITED

5758 unique locations (115539 components) - Page 6 of 231

Active MW: 262.73 MW
Inactive MW: 2869.65 MW
ADDERLEY AVENUE NUNEATON WARWICKSHIRE CV10 (2 components)

Load curtailment

Active • 2025-26 (T-1), 2022-23 (T-1)
ADEL GREEN LEEDS LS16 (2 components)
• Domestic EV charger
• Load drop
Active • 2024-25 (T-1), 2023-24 (T-1)
ADISHAM ROAD BEKESBOURNE CANTERBURY CT4 (1 component)

Load drop

Inactive • 2022-23 (T-1)
a Greenhill Drive Micklethwaite BINGLEY West Yorkshire BD16 (2 components)
• Load drop
• Standby generation
Active • 2025-26 (T-4), 2023-24 (T-1)
7.55 MW
Ainstey Drive YEOVIL SOMERSET BA22 (1 component)

Load curtailment

Inactive • 2017-18 (T-1)
AIREDALE DRIVE BROUGH HU15 (1 component)

Load curtailment

Inactive • 2023-24 (T-1)
4.28 MW
AL1 (92 components)
• EV charging at residential premises (2)
• EV charging on residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.40 MW
AL10 (27 components)
• Domestic EV charger
• EV charging at residential premises
• Gas CHP located in St. Austell
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.55 MW
AL2 (72 components)
• EV charging at residential premises (2)
• EV charging on residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AL3 (100 components)
• DSR components shall be assigned prior to the start of the Delivery Year.
• Domestic demand turn down
• Hydro Generation Unit
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.00 MW
AL4 (104 components)
• EV charging at residential premises (2)
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.33 MW
AL5 (127 components)
• Domestic demand turn down
• EV charging at residential premises
• domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
AL6 (60 components)
• EV charging at residential premises
• EV charging on residential premises
• domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AL7 (60 components)
• EV charging at residential premises (2)
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.28 MW
AL8 (42 components)
• Domestic demand turn down
• EV charging at residential premises
• EV charging on residential premises
Active • 2025-26 (T-1), 2024-25 (T-1) ...
AL9 (28 components)
• EV charging at residential premises (2)
• New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
ALANDALE DRIVE PINNER MIDDLESEX HA5 (2 components)
• Domestic EV charger
• Load drop
Active • 2025-26 (T-1), 2022-23 (T-1)
ALBA GARDENS CARLUKE LANARKSHIRE ML8 (2 components)
• Domestic EV charger
• Load drop
Active • 2025-26 (T-1), 2022-23 (T-1)
ALBANY VIEW, BUCKHURST HILL, ESSEX, IG9 (2 components)
• EV charging at residential premises
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
Inactive • 2023-24 (T-1), 2019-20 (T-1)
ALBERT DRIVE BASILDON ESSEX SS15 (2 components)
• Domestic EV charger
• Load drop
Active • 2025-26 (T-1), 2022-23 (T-1)
ALBERT ROAD CHATHAM KENT ME4 (1 component)

Load curtailment

Inactive • 2022-23 (T-1)
ALBERTROSS DRIVE GRIMSBY SOUTH HUMBERSIRE DN36 (1 component)

Load curtailment

Inactive • 2023-24 (T-1)
Albion Drive Larkfield Aylesford Kent ME20 (1 component)

DSR components to be assigned prior to the start of the Delivery Year.

Inactive • 2022-23 (T-1)
ALCOTT PLACE WINWICK WARRINGTON CHESHIRE WA2 (1 component)

Load curtailment

Inactive • 2023-24 (T-1)
4.28 MW
ALDCLIFFE ROAD LANCASTER LANCASHIRE LA1 (2 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Load drop
Active • 2025-26 (T-1), 2022-23 (T-1)
Loading map...
Showing 25 locations