Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GAS GENERATION COATBRIDGE LIMITED (DO NOT USE)

4 unique locations (206 components)

Active MW: 133.63 MW
Inactive MW: 682.73 MW
SL5 (99 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
PO6 (71 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
HA1 (33 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Burnbank Power Plant, Site to south of Burnbank Street, Greenhill, Coatbridge, North Lanarkshire ML5 2AY (3 components)

10 Gas reciprocating engines use for power generation with associated infrastructure

Active • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 4 locations