Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GB GAS HOLDINGS LIMITED

15 unique locations (138 components)

Active MW: 5534.83 MW
Inactive MW: 5560.08 MW
Roydon Recycling Newport 1, Blackwood Business Park, Newport Rd, Pontllanfraith, Blackwood NP12 2XN, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Roydon & Ltd Swinton - Unit 1 Junction Eco Park,, Rake Lane, Swinton. M27 8LU, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU (11 components)

Distribution centre with behind the meter back up generation

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (10 components)

Distribution Centre with behind the meter back-up generation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land to the West of Chapterhouse Close, Ellesmere Port, CH65 4EL (2 components)
• 49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
• 49.9 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
Active • 2024-25 (T-4), 2023-24 (T-4)
Land at Devilla Forest, Near Culross, Fife, KY12 8EW (3 components)
• New Build Battery Storage
• New build battery storage
Active • 2028-29 (T-4), 2027-28 (T-4)
IFA2 National Grid Land at Daedalus Airfield Lee-on-the-Solent PO13 9YA (8 components)

1,100MW electricity interconnector between GB and French transmission systems. IFA2 will use a High Voltage Direct Current (HVDC) cable for the connection between Great Britain and France. The electricity must …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (11 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4)
British Gas, Housesteads,Off Stockport Road, Hattersley, SK14 3QU (11 components)

Office site with behind the meter back up generation

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
97 Talbot Road, Stretford, Manchester, Lancashire M16 0TW (10 components)

Office site with behind the meter back up generation (3)

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
4 Callaghan Square, Cardiff, CF10 5BT (11 components)

Office site with behind the meter back up generation (3)

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
2 Leeds City Office Park, Leeds, West Yorkshire, LS11 5BD (11 components)

Office site with behind the meter back up generation (3)

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
2 Leeds City Office Park, Leeds, LS11 5BD (8 components)
• Office site with behind the meter back-up generation (2)
• Office site with behind the meter back-up generation.
DSR Veolia UK Limited Conditional LS11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (24 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 15 locations