Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GRIDBEYOND LIMITED

38 unique locations (300 components) - Page 4 of 4

Active MW: 908.13 MW
Inactive MW: 200.35 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (27 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (4 components)

on site generating CMU

Active • 2027-28 (T-4), 2024-25 (T-1) ...
Aspatria Creamery/Station Rd, Wigton CA7 2AR (7 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
96 Kings Rd, Immingham DN40 1QS (1 component)

New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.

Active • 2028-29 (T-4)
5 Coulman St, Thorne, Doncaster DN8 5JT (1 component)

new build on site generating CMU

Active • 2027-28 (T-4)
2 Samworth Way, Melton Mowbray LE13 1GA (6 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 8 locations