GRIDBEYOND LIMITED

22 unique locations (172 components)

Active MW: 844.26 MW
Inactive MW: 264.22 MW
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (4 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX].

Active • 2026-27 (T-4), 2023-24 (T-1)
Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.

Active • 2027-28 (T-4)
Netherton Farm, Keith AB55 5PE (12 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (1 component)

New-Build Li-Ion BESS, 2hr duration.

Active • 2028-29 (T-4)
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (10 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Link Road, Launceston, Cornwall, PL15 9LP England (5 components)
• New-Build Li-Ion BESS, 2hr duration.
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (4 components)
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land South of Church Farm, Somersham, IP8 4PN and Land East of The Channel, Burstalhill, IP8 4JL (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land South East Of A6108, Darlington Road, Richmond, North Yorkshire, DL10 7ED (1 component)

A new build 2 hr duration Lithium-Ion Energy Storage Site

Active • 2027-28 (T-4)
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (8 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1) ...
Land east of Grahamston Road, Paisley, PA2 7DA (1 component)

60MW / 120MWh BESS

Active • 2026-27 (T-4)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2024-25 (T-1)
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant
Active • 2025-26 (T-4), 2024-25 (T-4)
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (4 components)
• Battery Energy Storage System
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Hams Lane, Lea Marston CP, North Warwickshire, Warwickshire, England, B76 0BL (1 component)

98MW / 196MWh BESS

Active • 2026-27 (T-4)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (92 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 22 locations