Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GSES 1 LIMITED

36 unique locations (180 components) - Page 1 of 2

Active MW: 54.72 MW
Inactive MW: 128.11 MW
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (6 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.86 MW
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (2 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Potash Farm, Nash Road, Beachampton, MK19 6EA (9 components)

49.900MW one-hour duration battery energy storage facility.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
New River Head TWRM Shaft & WBS, Amwell Street, Finsbury, London, United Kingdom, EC1R 1XU (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Lower Road, Brentwood, CM13 1BZ (1 component)

Advanced battery energy storage system

Inactive • 2019-20 (T-1)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (1 component)

1.200MW of battery storage located at Durham.

Inactive • 2020-21 (T-1)
Lascar Works, Tanpits Road, Bury, BL9 5BY (1 component)

20.000MW of battery storage located at Lascar Works

Inactive • 2020-21 (T-1)
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.44 MW
Larport Farm Larport Lane Dormington Hereford HR1 4EP (2 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Land North of Clayhill, Westoning, MK45 5JD. (5 components)

1.200MW of battery storage located at Westoning.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Hungerford Farm, Winchfield, Hook, RG27 8SW (1 component)

1.200MW of battery storage located at Hook.

Inactive • 2020-21 (T-1)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (8 components)
• 1.000MW of battery storage located at Staffordshire.
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (2 components)

1.000MW of battery storage located at Staffordshire.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (9 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Grafham INTAKE WA, GRAFHAM INTAKE (OFFORD) WA S2, Offord, HUNTINGDON Cambridgeshire, PE19 5RG, (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Forkers Yard, Off Shaw Street, West Bromwich, B70 0TX (1 component)

99.4MW/99.4MWh brownfield BESS located off Shaw Street on a plot of land called Forkers Yard in West Bromwich, England

Active • 2025-26 (T-4)
Ferrymuir Farm, Cupar, KY15 5RW (6 components)

49.900MW one-hour duration battery energy storage facility.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (1 component)

1.200MW of battery storage located at Preston.

Inactive • 2020-21 (T-1)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2 components)

1.200MW of battery storage located at Preston.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment.

Active • 2027-28 (T-4), 2026-27 (T-4)
Loading map...
Showing 25 locations