Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

IMPACT POWER LIMITED

3 unique locations (17 components)

Active MW: 4.10 MW
Inactive MW: 0.53 MW
The Emirates Stadium, Hornsey Rd, London N7 7AJ (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Behind-the-meter battery storage system located at Emirates Stadium in London.
• Generating Unit 2
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Gas Fired - CHP
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
Loading map...
Showing 3 locations