Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

188 unique locations (1452 components) - Page 1 of 8

Active MW: 1114.38 MW
Inactive MW: 1397.87 MW
YWA WESTERN, COPLEY STW WAKEFIELD, COPLEY, HALIFAX, WEST YORKSHIRE, HX 0TL (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
WOODHAM WALTER PUMPING STATION, LITTLE BADDOW ROAD, WOODHAM WALTER, MALDON , CM9 6RU (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
WHITTLE DENE T/W, HARLOW HILL, NEWCASTLE UPON TYNE,NON PAF ADDRESS, NE15 0 (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Whatley, Frome, Somerset, BA11 3LF (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
30.00 MW
West Lane, Ellistown, Coalville, Leicestershire, LE67 1FA (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
30.00 MW
West Hyde Pumping Station, Coppermill Lane, Rickmansworth, Hertfordshire, WD3 9XS (3 components)

Water Pumping Station

Inactive • 2017-18 (TR)
Weighbridge Road, Shotton, Deeside, CH5 2LL (22 components)

Paper mill industrial site

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
16.00 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
WATER TREATMENT WORKS, WESSEX WATER LIMI, SUTTON BINGHAM, YEOVIL, SOMERSET, BA22 9QL (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
Walton Lane, Walton on Thames, KT12 1QP (3 components)

Diesel Generation

Inactive • 2017-18 (T-1)
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (18 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
30.00 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
TWERTON PUMP STN, MIDLAND ROAD DEPOT, BATH, BA2 3BS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
2.71 MW
Tunstead, Derbyshire, SK17 8TG (3 components)

Aggregates site

Inactive • 2017-18 (TR)
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (14 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
To be determined (111 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Thorney Lane, North Iver, SL0 9HF (4 components)

Diesel Generation

Inactive • 2017-18 (T-1)
The Causeway, Staines, TW18 3BX (4 components)

Diesel Generation

Inactive • 2017-18 (T-1)
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (2 components)

On site reduction in consumption (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (9 components)

2MW BESS

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TA9 3QG (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations