Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

175 unique locations (965 components) - Page 2 of 18

Unit A, The Loddon Centre, Basingstoke, RG24 8QW (11 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (14 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
208.85 MW
TWERTON PUMP STN, MIDLAND ROAD DEPOT, BATH, BA2 3BS (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Tunstead, Derbyshire, SK17 8TG (2 components)

Aggregates site

Inactive • 2017-18 (TR)
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (11 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.06 MW
To be determined (77 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

DSR Do Not Use Not Prequalified
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
Thorney Lane, North Iver, SL0 9HF (2 components)

Diesel Generation

Inactive • 2017-18 (T-1)
The Causeway, Staines, TW18 3BX (2 components)

Diesel Generation

Inactive • 2017-18 (T-1)
Loading map...
Showing 10 locations