Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

69 unique locations (561 components) - Page 4 of 7

Active MW: 907.38 MW
Inactive MW: 1604.87 MW
Lochaber Smelter Fort William Scotland PH33 6TH (9 components)
• Furnace
• Furnaces
Active • 2025-26 (T-1), 2023-24 (T-1) ...
30.00 MW
Lochaber Smelter Fort William Scotland PH33 6TH (17 components)

Furnaces

Active • 2024-25 (T-1), 2023-24 (T-4) ...
15.78 MW
London Road, Grays, Essex, RM20 3NL (2 components)
• Hanson Purfleet (Old) - reduction of on site consumption
• Hanson Purfleet site - reduction of on site consumption
Active • 2024-25 (T-1)
3.35 MW
LUMLEY TREATMENT WORKS, GREAT LUMLEY, CHESTER LE STREET, CO DURHAM, DH3 4HG (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
MARSKE SEWAGE TREATMENT WORKS, GREEN LANE, MARSKE-BY-THE-SEA, REDCAR, NON PAF ADDRESS, TS11 6 (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (15 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
MOSSWOOD TREATMENT WORKS, CONSETT, DH8 9BD (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
New Victoria Park, Grange Road, Glasgow, G42 9LF (20 components)

Generators at hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
11.71 MW
Padeswood Works, Chester Road, Mold, Flintshire, CH7 4HB (7 components)
• Proven reduction of site consumption
• Site is Load Reduction / DSR Turn Down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
7.81 MW
Loading map...
Showing 10 locations