Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

163 unique locations (1382 components) - Page 2 of 7

Active MW: 1446.50 MW
Inactive MW: 1065.75 MW
BRANTHAM MILL PUMPING STATION, BERGHOLT ROAD, BRANTHAM, MANNINGTREE, CO11 1QT (3 components)

On site reduction in consumption

Inactive •
3.74 MW
Braunton Road Ashford Barnstaple Devon EX31 4BR (7 components)

Water treatment centre

Inactive •
BROKEN SCARR PUMPING STATION, CONISCLIFFE ROAD, , DARLINGTON, DL3 8TF (3 components)

On site reduction in consumption

Inactive •
3.74 MW
BS21 6UY (24 components)

Water treatment centre

Inactive •
Burnside Mills, Kendal,Cumbria,LA9 6PZ (12 components)

Gas fired CHP unit (3)

Inactive •
Cauldon Works, Yelsway Ln, Cauldon, Stoke-on-Trent ST10 3EQ (11 components)

Cauldon Cement plant site - DSR participation through on-site shut down/ pause in production etc.

Inactive •
Chenhalls Road St Erth Hale Cornwall TR27 6LA (8 components)

Water treatment centre

Inactive •
14.00 MW
CHILTON TRINITY S T W, SALTLANDS, BRIDGWATER, SOMERSET, TA6 3JQ (3 components)

On site reduction in consumption

Inactive •
2.71 MW
Christchurch Bournemouth BH23 2JY (8 components)

Water treatment centre

Inactive •
2.71 MW
2.71 MW
Coleshill, Birmingham, West Midlands, B46 1JY (1 component)

On site reduction in consumption

Inactive •
30.00 MW
14.00 MW
Denmark Hill, Brixton, London, SE5 9RS (21 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Inactive •
Denmark Hill, London, SE5 9RS (5 components)

Gas Fired CHP

KIWI POWER LTD Not Prequalified SE5
Inactive •
DERWENTHAUGH PUMPING STATION, SWALWELL, BLAYDON ON TYNE, NE21 5TE (3 components)

On site reduction in consumption

Inactive •
3.74 MW
Downs Rd, Sutton SM2 5PT (1 component)

Behind the Meter CHP

Inactive •
DURLEIGH FILTER STATION, ENMORE ROAD, DURLEIGH, BRIDGWATER, SOMERSET, TA5 2AW (3 components)

On site reduction in consumption

Inactive •
2.71 MW
Francis Avenue Bournemouth BH11 8NX (9 components)

Water treatment centre

Inactive •
14.00 MW
Glenfield Hospital, Groby Road, Leicester, LE3 9QP (9 components)
• CHP Unit
• Gas Fired CHP
Inactive •
Grain LNG Importation Terminal, Isle of Grain, Rochester, Kent ME3 0AB (4 components)

Back Up Generator

DSR KIWI POWER LTD Not Prequalified
Inactive •
1.50 MW
Greengairs Wind Farm, Greengairs, ML6 7TY (4 components)

Onshore Wind Farm at Greengairs

Inactive •
Loading map...
Showing 25 locations