Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KIWI POWER LTD

118 unique locations (742 components) - Page 4 of 5

Active MW: 1446.50 MW
Inactive MW: 1065.75 MW
STEVENSTON SEWAGE TREATMENT WORKS, LUNDHOLM ROAD,STEVENSTON, AYRSHIRE,KA20 3LJ (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Stoneykirk Road, Stranraer, DG9 7BU (29 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
SWANAGE WASTE WATER, TREATMENT WORKS, NR. MARINE VILLAS, HIGH STREET, SWANAGE, DORSET, BH19 2AP (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
TWERTON PUMP STN, MIDLAND ROAD DEPOT, BATH, BA2 3BS (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
2.71 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2021-22 (T-1) ...
Walton Lane, Walton on Thames, KT12 1QP (4 components)

Diesel Generation

Active • 2017-18 (T-1)
14.00 MW
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
WATER PUMPING STATION, MIDDLEMEAD, WEST HANNINGFIELD, CHELMSFORD, CM3 8HS (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
WATER TREATMENT WORKS, WARKWORTH, MORPETH, NE65 0UB (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
WATER TREATMENT WORKS, WESSEX WATER LIMI, SUTTON BINGHAM, YEOVIL, SOMERSET, BA22 9QL (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
WESSEX WATER P/S, BUSHES ROAD, BLANDFORD, DT11 8US (3 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
Loading map...
Showing 25 locations