Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

11 unique locations (101 components) - Page 1 of 2

133 Balornock Road, Glasgow, G21 3UW (13 components)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
Asda Kilmarnock, 10 Queens Drive , Kilmarnock, KA1 3XF (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
BATTERSEA POWER STATION LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.19 MW
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (6 components)
• 1.500MW Demand reduction at Coventry Bus Depot
• bus depot site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
G66 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.12 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (7 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
Active • 2025-26 (T-4), 2024-25 (T-1) ...
3.72 MW
New Victoria Park, Grange Road, Glasgow, G42 9LF (13 components)

Generators at hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
PL14 (4 components)

Domestic demand turn down

Active • 2027-28 (T-4), 2024-25 (T-1)
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (13 components)
• 10.000MW DSR
• New Build Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System …
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Loading map...
Showing 10 locations