LIMEJUMP LTD

10 unique locations (77 components)

Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (5 components)
• 0.500MW Battery Energy Storage System
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (13 components)
• 10.000MW DSR
• New Build Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Norbord Morayhill Dalcross Inverness IV2 7JQ (6 components)
• 4.000MW of demand reduction
• 4MW of demand reduction
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Norbord Cowie Station Road Cowie Stirling FK7 7BQ (9 components)
• 3.600MW of demand reduction
• 3.6MW of demand reduction
• 5MW of demand reduction
Active • 2026-27 (T-4), 2025-26 (T-4) ...
G66 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.22 MW
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (6 components)
• 1.500MW Demand reduction at Coventry Bus Depot
• bus depot site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (8 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
Loading map...
Showing 10 locations