Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

LIMEJUMP LTD

5 unique locations (44 components)

Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)

8.300MW Gas Turbine installation (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
3.06 MW
Cowie Sterling FK7 7BQ (9 components)

14.710 MW CHP generation (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.44 MW
BATTERSEA POWER STATION LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.19 MW
0.91 MW
Loading map...
Showing 5 locations