Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

44 unique locations (288 components) - Page 1 of 2

Active MW: 393.19 MW
Inactive MW: 784.54 MW
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (8 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Active • 2021-22 (T-4), 2019-20 (T-1) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (8 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Trent Basin Nottingham NG2 4DS (5 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Active • 2021-22 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (5 components)

0.9MW Battery storage located at Hampshire

Active • 2021-22 (T-4), 2018-19 (T-1)
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (6 components)

0.8MW demand reduction

Active • 2021-22 (T-4), 2018-19 (T-1)
Stroud Green Lane, Fareham, PO14 2HS (5 components)

40MW of Demand Reduction

Active • 2021-22 (T-4), 2018-19 (T-1)
Solar Farm High Meadow Farm Carlton Village Carlton Stockton-on-Tees Durham TS21 1EA (5 components)

Demand reduction

Active • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (4 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Active • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (16 components)

8.3MW Gas Turbine installation

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)

3MW Battery Storage facility located at Scarborough

Active • 2021-22 (T-4), 2018-19 (T-1)
Salford Lodge Pitchill Evesham WR11 8SN (5 components)

0.1MW Tesla battery located at Eversham

Active • 2021-22 (T-4), 2018-19 (T-1)
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (5 components)

1.5MW battery located in Southampton

Active • 2021-22 (T-4), 2018-19 (T-1)
Poplars Solar Farm Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (5 components)

1MW of demand reduction

Active • 2021-22 (T-4), 2018-19 (T-1)
Poole Hospital Longfleet R Poole BH15 2JB (5 components)

0.85 MW CHP Located at Poole Hospital

Active • 2021-22 (T-4), 2018-19 (T-1)
Pierces Farm PV Palmers Lane Near Grazeley Burghfield Reading RG7 3AH (5 components)

0.25MW of demand reduction

Active • 2021-22 (T-4), 2018-19 (T-1)
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)

3.75 MW storage battery located in Devon

Active • 2021-22 (T-4), 2018-19 (T-1)
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (5 components)

0.261MW Storage Battery located in Devon

Active • 2021-22 (T-4), 2018-19 (T-1)
Peel Common Battery Storage, Newgate Ln, Fareham, PO14 1JD (5 components)

20 MW storage battery

Active • 2021-22 (T-4), 2018-19 (T-1)
Oxcroft Farm Stanfree Chesterfield Derbyshire S44 6AG (5 components)

0.8MW demand reduction

Active • 2021-22 (T-4), 2018-19 (T-1)
Oaks Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (9 components)
• 1MW demand reduction
• 1MW of demand reduction
Active • 2021-22 (T-4), 2019-20 (T-1) ...
Media City Prestwood Rd Salford M50 2EQ (5 components)

2MW CHP located at Salford

Active • 2021-22 (T-4), 2018-19 (T-1)
Lucern Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (9 components)
• 1MW demand reduction
• 1MW of demand reduction
Active • 2021-22 (T-4), 2019-20 (T-1) ...
Low Burntoft Farm Wolviston Billingham Durham TS22 5PD (5 components)

Demand reduction

Active • 2021-22 (T-4), 2018-19 (T-1)
Land North of Clayhill Farm Westoning MK45 5JD (9 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Active • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations