Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

406 unique locations (2334 components) - Page 1 of 17

Active MW: 115.01 MW
Inactive MW: 1062.72 MW
XPO Lowestoft Mobbs Way, Lowestoft NR32 3BN, United Kingdom (22 components)
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (9 components)
• 4MW of DSR
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (33 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (3 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (3 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (7 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
• Gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S803LH (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
• Reciprocating engines
Active • 2025-26 (T-4), 2021-22 (T-4) ...
Whitewall Cottages, Upnor Rd, Upnor, Rochester, ME2 4UZ (4 components)

50 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Weights Farm,Weights Lane,Redditch,B97 6RG (3 components)

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

Inactive • 2017-18 (T-1)
Weeke Down, Lanham Lane, Winchester, SO22 5QL (2 components)

35 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 35*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2017-18 (T-1)
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (3 components)
• 2.6MW of demand reduction
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2024-25 (T-1), 2023-24 (T-4)
WATERSIDE BELMONT 10 WATERSIDE, BELMONT, BOLTON, LANCASHIRE, BL7 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.69 MW
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (3 components)
• 29MW of DSR
• A new Build Generating Storage CMU
Inactive • 2023-24 (T-4), 2020-21 (T-1)
Uskmouth Power Station, West Nash Road, Nash, Newport, Gwent NP18 2BZ (9 components)
• 2MW (1 X 2 MW diesel gensets )
• One CHP engine in a horticultural environment with no auxilliary load.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (3 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2019-20 (T-1)
16.37 MW
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (4 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit A Broadway Industrial Estate Broadway Hyde SK14 4QF (4 components)

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Unit 4 01-May Davygate North Yorkshire Great Britain YO1 8QR (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 14 10 Paternoster Square Great Britain EC4M 7DX (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Loading map...
Showing 25 locations