Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Limejump Virtual 3 Limited

3 unique locations (5 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Birch Holt Farm Burton By Lincoln LN1 2RG (1 component)

The CMU component at Leverton Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 5MW.

Storage Limejump Virtual 3 Limited New Build Generating CMU Leverton LN1
Inactive • 2018-19 (T-1)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU KnotKirkThry WF11
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Kirkthorpe Weir Kirkthorpe Wakefield West Yorkshire WF1 5SY (1 component)

The CMU component at Kirkthorpe is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW

Storage Limejump Virtual 3 Limited New Build Generating CMU KnotKirkThry WF1
Inactive • 2018-19 (T-1)
Loading map...
Showing 3 locations