Limejump Virtual 1 Limited

20 unique locations (147 components)

Active MW: 292.61 MW
Inactive MW: 885.12 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Asda Farnborough, Portsmouth Rd, Frimley, Surrey GU16 7UJ (7 components)
• 24.95 MW of Battery Storage located at Waterlooville.
• Load curtailment on site and standby generation
• Load curtailment via standby generation exporting excess
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (2 components)

5.2MW of batteries across several sites

Inactive • 2018-19 (T-1)
Clay Tye Rd, Cranham, London Borough of Havering, RM14 3PL, United Kingdom (1 component)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2021-22 (T-4)
Hungerford Farm, Winchfield, Hook RG27 8SW (2 components)

5.4 MW of battery storage units across different sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Hungerford Farm, Winchfield, Hook RG27 8SW (3 components)

5.4 MW of battery storage units across different sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at Manor Farm Wainfleet Road Irby in the Marsh Skegness Lincolnshire PE24 5AY (1 component)

9.408 MW of Battery Storage at Land at Manor Farm, Lincolnshire.

Inactive • 2021-22 (T-4)
Land at Walworth Farm Bishops Itchington Southam Warwickshire CV47 2SR (1 component)

15 MW Battery Storage facility located at Warwickshire.

Inactive • 2021-22 (T-4)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (1 component)

5 MW of Battery Storage located at Ilmer.

Inactive • 2021-22 (T-4)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (1 component)

5 MW of Battery Storage located at Ilmer.

Inactive • 2021-22 (T-4)
Land North of Clayhill Farm Westoning MK45 5JD (4 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land North of Harriots Hayes Lane Albrighton Shropshire WV8 1RQ (1 component)

4.704 MW of Battery Storage located at Shropshire.

Inactive • 2021-22 (T-4)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (10 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (12 components)
• 7 MW of Battery Storage located at Grantham.
• A 7.5MW Battery Energy Storage System
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Needless Hall Farm Toronto Bishop Auckland DL14 7RJ (1 component)

21.6 MW of Battery Storage located in Bishop Auckland.

Inactive • 2021-22 (T-4)
Partridge Hill Farm Austerfield Doncaster DN10 6HA (1 component)

10 MW of Battery Storage located at Doncaster.

Inactive • 2021-22 (T-4)
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (1 component)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2018-19 (T-1)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...