MANNINGTON ENERGY CENTRE LIMITED

3 unique locations (166 components)

Active MW: 0.00 MW
Inactive MW: 53.99 MW
BRIARSWOOD WAY ORPINGTON KENT BR6 (3 components)
• 2h-duration battery system
• Description: New natural gas reciprocating genset in acoustic enclosure with 433V/11kV transformer. Location: Asher Lane;Ripley;Derbyshire;DE5 3RE. Conneciton Capacity: Gross output 2.000MW; direct box auxiliary 40kW; 2kW out of 5kW of site auxiliary allocated to this CMU Component; Net Connection Capacity 1.958 MW; No seperate import supplies to this CMU Component.
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.91 MW
RG27 (125 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
6.91 MW
WV16 (38 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.96 MW
Loading map...