Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

NEVERN POWER LIMITED

9 unique locations (347 components)

Active MW: 0.00 MW
Inactive MW: 59.26 MW
SYCAMORE CLOSE LONG CRENDON AYLESBURY BUCKINGHAMSHIRE HP18 (3 components)
• 16 MW power plant comprising 8 x 2MW reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• Domestic EV charger
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2021-22 (T-1) ...
Nevern Power Wayn-Y-Pound Industrial Estate Ebbw Vale Gwent NP23 6PL (4 components)

16 MW power plant comprising 8x2MW reciprocating engines. The power plant is connected to the local distribution and gas network.

Active • 2019-20 (T-1)
LE5 (70 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
L16 (40 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
KT9 (38 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
14.18 MW
HU8 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
EH29 (34 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
CV31 (67 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
AL2 (72 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 9 locations