Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

7795 unique locations (69710 components) - Page 193 of 312

Active MW: 1408.48 MW
Inactive MW: 447.19 MW
GUILDOWN AVENUE LONDON N12 (1 component)

EV charging at residential premises

Inactive •
GU9 (37 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU8 (24 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU6 (38 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU52 (34 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU51 (48 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
GU47 (18 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU46 (33 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
0.04 MW
GU4 (27 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU35 (40 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU34 (70 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU3 (13 components)
• Domestic demand turn down (2)
• Domestic EV charger
Inactive •
0.04 MW
GU28 (19 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU27 (20 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU26 (30 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU25 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU24 (19 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
0.12 MW
GU23 (16 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU22 (44 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.12 MW
GU21 (32 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU2 (22 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU19 (9 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU17 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
GU16 (48 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
0.04 MW
GU15 (52 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
Loading map...
Showing 25 locations