Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

7789 unique locations (68928 components) - Page 298 of 312

Active MW: 1408.48 MW
Inactive MW: 447.19 MW
WEST VOWS WALK KIRKCALDY KY1 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW
WEST VOWS WALK, KIRKCALDY, KY1 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Westward Drive Bristol Avon BS20 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW
Westward Ho Wirral Merseyside CH48 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WEST WATER CRESCENT HAMPTON VALE PETERBOROUGH CAMBRIDGESHIRE PE7 (11 components)

EV charging at residential premises

Active • 2023-24 (T-1), 2024-25 (T-1) ...
14.00 MW
West Way Broadstone Dorset BH18 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WESTWICK CRESCENT SHEFFIELD S8 (4 components)

EV charging at residential premises

Active • 2023-24 (T-1)
0.00 MW
WESTWICK ROAD SHEFFIELD S8 (4 components)

EV charging at residential premises

Active • 2023-24 (T-1)
0.00 MW
WESTWOOD ROAD SUTTON COLDFIELD WEST MIDLANDS B73 (4 components)

EV charging at residential premises

Active • 2023-24 (T-1)
0.00 MW
Wetherby Close Consett County Durham DH8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WETHERINGSETT ASHLAND MILTON KEYNES BUCKINGHAMSHIRE MK6 (9 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2026-27 (T-4) ...
3.60 MW
WEYBRIDGE DRIVE MACCLESFIELD CHESHIRE SK10 (4 components)

EV charging at residential premises

Active • 2023-24 (T-1)
0.00 MW
Weymouth Drive Houghton Le Spring DH4 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
Weymouth Drive, Houghton Le Spring, DH4 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Weyside Close Byfleet West Byfleet Surrey KT14 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WF1 (34 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
WF10 (29 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
WF11 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
WF12 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.08 MW
WF14 (29 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
WF16 (6 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2025-26 (T-1) ...
0.04 MW
WF17 (33 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.08 MW
WF2 (37 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.12 MW
WF3 (47 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
WF4 (77 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
Loading map...
Showing 25 locations