PD688IRO LTD

14 unique locations (326 components)

Active MW: 0.00 MW
Inactive MW: 233.24 MW
WA10 (53 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
TN24 (62 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
ROXBOROUGH AVENUE ISLEWORTH MIDDLESEX TW7 (3 components)
• A Battery Energy Storage System.
• Domestic EV charger
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Active • 2028-29 (T-4), 2025-26 (T-4) ...
39.65 MW
PERRYFIELD WAY RICHMOND SURREY TW10 (3 components)
• A Battery Energy Storage System.
• Bridgwater Somerset. New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-4) ...
39.65 MW
PE37 (21 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
11.22 MW
M26 (46 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (4 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4)
Land at Somerford Farm, SN16 9RN (2 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (5 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2026-27 (T-4)
EH53 (59 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CEDAR ROAD WEYBRIDGE SURREY KT13 (3 components)
• A Battery Energy Storage System.
• Domestic EV charger
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Active • 2028-29 (T-4), 2025-26 (T-4) ...
39.65 MW
CB11 (59 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CASTLE STREET KENDAL CUMBRIA LA9 (3 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
24.86 MW
BARTON CLOSE EAST COWES ISLE OF WIGHT PO32 (3 components)
• A Battery Energy Storage System.
• CMU output is nett of auxiliary load
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-4) ...
39.65 MW
Loading map...
Showing 14 locations