PIVOTED POWER LLP

4 unique locations (24 components)

Active MW: 159.58 MW
Inactive MW: 173.51 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (14 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Land at Ellbridge Farm, Ellbridge Lane, Hatt Saltash PL12 6PU (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
Land on the north west side of Holt Road, Mannington Heath, Wimborne BH21 6SE (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2021-22 (T-1), 2024-25 (T-4) ...