Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Palm Paper Limited

4 unique locations (138 components)

Active MW: 0.00 MW
Inactive MW: 44.55 MW
CF48 (26 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (4 components)
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant and buildings.
Active • 2028-29 (T-4), 2021-22 (T-4)
THE CHERRIES EUXTON CHORLEY LANCASHIRE PR7 (1 component)

The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.

Active • 2028-29 (T-4)
42.50 MW
WA7 (107 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 4 locations