Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Plutus Energy LTD

11 unique locations (80 components) - Page 1 of 2

BAFFAM COURT BAFFAM LANE BRAYTON SELBY YO8 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Carr Street Selby YO8 8AW (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4)
Drax Power Station Drax Selby YO8 8PH (8 components)
• Unit 1 fuelled by Biomass at Drax Power Station
• Unit 3 fuelled by Biomass at Drax Power Station
• Unit 4 fuelled by Biomass at Drax Power Station
Active • 2028-29 (T-4), 2027-28 (T-4)
2238.05 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (58 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
86.43 MW
Drax Power Station, Selby, YO8 8PH (1 component)

New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site

Inactive • 2023-24 (T-4)
Gascoigne Wood Mine Lennerton lane Sherburn in Elmet Selby LS25 6LH (1 component)

Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW

Inactive • 2020-21 (T-4)
Gascoigne Wood Mine Lennerton Lane Sherburn in Elmet Selby LS25 6LH (2 components)
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 110 KW
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Inactive • 2020-21 (T-4)
MYRTLE AVENUE SELBY YO8 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Rusholme Grange, Drax, Selby, YO8 8PW (1 component)

The CMU component at Rusholme Grange is an energy storage system comprised of Lithium-ion batteries. The system will have a 35 MW export capacity and an import capacity of 36.8 …

Inactive • 2021-22 (T-4)
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (2 components)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
33.39 MW
Loading map...
Showing 10 locations