Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

PRECISE ENERGY LIMITED

10 unique locations (422 components)

Active MW: 0.00 MW
Inactive MW: 75.73 MW
CT5 (58 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
HD9 (113 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
IV2 (78 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Kiln Yard Cuck Stool Lane Castle Acre King's Lynn PE32 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land at Earnest Nunn Road, Stowmarket, IP14 2AH (3 components)

CMU is a new 20MW facility, metered on the edge of the distrbution boundary using a COP2 meter and with no auxilliary load on site.

Active • 2018-19 (T-1)
Land at Ernest Nunn Road, Stowmarket, IP14 2AH (3 components)

CMU is a new 20MW facility, metered on the edge of the distrbution boundary using a COP2 meter and with no auxilliary load on site.

Active • 2019-20 (T-1)
NP26 (78 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Park Wall Lane Upper Basildon Reading RG8 (1 component)

CMU is a new 20MW facility, metered on the edge of the distrbution boundary using a COP2 meter and with no auxilliary load on site.

Inactive • 2019-20 (T-1)
Precise Energy, Land at Earnest Nunn Road, Stowmarket, IP14 2AH (1 component)

CMU Component is 500kVA reciprocating diesel engine.

Inactive • 2020-21 (T-4)
S35 (86 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 10 locations