Prime Energy Development Limited

17 unique locations (180 components)

Active MW: 18.83 MW
Inactive MW: 341.80 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Awbridge Farm, Union Lane, Trysull, WV4 4YA (1 component)

20 MWs of reciprocating engine generation connecting into existing 33kv substation

Inactive • 2020-21 (T-4)
Land at Barley Pound Farm Crondall GU10 5HL (1 component)

20 MWs of reciprocating engine generation connecting into existing 33kV pole

Inactive • 2020-21 (T-4)
Land at Fordbridge Lane, Blackwell, DE55 5JY (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Land at Outclough Farm, Biddulph Road, ST6 8UW (1 component)

20 MWs of reciprocating engine generation connecting into existing 33kV substation

Inactive • 2021-22 (T-4)
Land at Polhampton Farm, Overton, Basingstoke, RG25 3ED (2 components)
• 9.5 MWs of reciprocating engine generation connecting into existing 33kV substation
• A gas engine CHP site providing hot water to a local district heating network
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Land at Thornton Lane Markfield LE67 9TU (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land off Coastal Road, Scarborough, YO13 0DE (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
• The site comprises of gas reciprocating unit(s)
Inactive • 2022-23 (T-4), 2020-21 (T-4)
LAND ON THE NORTH SIDE OF GALLEY HILL ROAD NORTHFLEET GRAVESEND DA11 9SW (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• Existing OCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Land to the West of Ransomes Way, Nacton Road, Ipswich, IP3 9SQ (1 component)

20 MWs of reciprocating engine generation connecting into existing 33kv substation

Inactive • 2020-21 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Mill Nurseries, Ottringham Road, Keyingham, Hull, HU12 9RX (11 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
• Gas fired CHP unit
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Morton Hill Farm and land on the East side of Blyth Road, Babworth, DN22 8HE (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Inactive • 2020-21 (T-4)
Vale Farm, Enmill Lane, Pitt, Winchester, SO22 5QW (3 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20MWs of reciprocating engine generation connecting into an existing 33 kV pole on land at Vale Farm, Enmill Lane, Pitt, Winchester, SO22 5QW
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Loading map...
Showing 17 locations