RWE GENERATION UK PLC

7 unique locations (67 components)

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (40 components)
• The CMU component at Castelbridge is an energy storage system comprised of batteries and will have an import and export capacity of 5MW.
• This power plant is a series of modular integrated energy storage rack with batteries which serve as easily configurable building blocks. These racks are organized into individually managed GBS Zone subsystems which are able to be installed in standard ISO containers or in customized enclosures. There is an integrated control architecture with local user interface per battery zone, Integrated air conditioning units, fire detection and suppression system and an auxillary power distribution panel. There is an embedded DC isolation switch (per zone) with safety interlock management system. There is extensive fusing and protections at multiple levels of the system.
• West Burton A Power Station CMU 4 WA4-17= 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (2 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage).
• The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery container positioned ready for connection to the sub-station, testing and commissioning.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (5 components)
• Aux. load separately metered
• Storage facility
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stanstead Abbots Ware Hertfordshire SG12 8JY (2 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
RWE Generation UK plc, Hythe Power Station, Charleston Road Hardley Hythe Southampton SO45 3BP (1 component)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4 Redcote Lane Kirkstall Leeds LS4 2 AL (1 component)

50 MW battery generation system, Leeds.

Inactive • 2021-22 (T-4)