RWE GENERATION UK PLC

6 unique locations (88 components)

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 6 locations