RWE GENERATION UK PLC

7 unique locations (55 components)

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (4 components)
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (5 components)
• A 20MW New Build gas fuelled generating station.
• CMU will be formed of multiple individual reciprocating gas engines.
• Unit 1 Cruachan pumped storage hydro plant
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (6 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (9 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Flour Mill
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (13 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...