Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RWE GENERATION UK PLC

14 unique locations (149 components)

Active MW: 12043.93 MW
Inactive MW: 50669.78 MW
4 Finway Road Hemel Hempstead HP2 7PT (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Caxton Way, Dinnington, Rotherham, S25 3QE (7 components)
• A 10MW new build gas generating station..
• A 20MW new build gas generating station..
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (6 components)
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (15 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land off Nottingham Rd, Loughborough Leicestershire LE11 1ET (13 components)

Gas fired reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-4) ...
land to the east of Worset Lane, Hartlepool, TS27 3BG (4 components)

A new build, gas fuelled generation station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lawns Avenue, Wigan, WN5 8UH (5 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Salford Road, Over Holton, Bolton, Lancashire BL5 1BW (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Union Street, Manchester, M27 4HL (4 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Units 1-4, 730 London Road, West Thurrock, Essex, RM20 3NL (6 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• gas fired reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 14 locations