RWE GENERATION UK PLC

28 unique locations (135 components) - Page 1 of 2

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• A new build 11MW battery storage system
• A new build gas fuelled generating station.
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (4 components)
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (5 components)
• A 20MW New Build gas fuelled generating station.
• CMU will be formed of multiple individual reciprocating gas engines.
• Unit 1 Cruachan pumped storage hydro plant
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Cramptons Road Pumping Station, Cramptons Road, Sevenoaks, TN14 5BQ (8 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (6 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (3 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (7 components)
• Didcot B5 - CCGT
• Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary Infrastructure including Access Roads, Weighbridges, Fencing/Gates, Lighting, Emissions Stack, Surface Water Drainage Basins and Landscaping.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
King?s Lynn Power Station Willows Business Park Saddlebow Kings Lynn PE34 3RD (1 component)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2020-21 (T-4)
King?s Lynn Power Station Willows Business Park Saddlebow Kings Lynn PE34 3RD (1 component)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2020-21 (T-4)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (2 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (4 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (11 components)
• Battery Energy Storage System
• Gas peaking reciprocating engine
• Little Barford 1 OCGT . fuel type is distillate
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF (2 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• One (1) Open Cycle Gas Turbine
Inactive • 2021-22 (T-4)
RWE Cogen UK Ltd Moody Lane Grimsby DN31 2SW (1 component)

CMU will be formed of multiple individual gas reciprocating engine units

Inactive • 2020-21 (T-4)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (3 components)
• CMU will be formed of multiple individual gas reiprocating engine units
• Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter
Inactive • 2020-21 (T-4), 2017-18 (T-1)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (2 components)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

Inactive • 2020-21 (T-4), 2017-18 (T-1)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
• Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations