Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RWE GENERATION UK PLC

67 unique locations (1302 components) - Page 1 of 3

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Didcot B5 - CCGT MSID: 4055
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Severn Power Station West Nash Road Nash Newport NP18 2BZ (14 components)
• Existing CCGT Unit
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (18 components)
• Combined Cycle Gas Turbine
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
• Pembroke 51 - CCGT MSID: 7237
Active • 2025-26 (T-4), 2025-26 (T-1) ...
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Active • 2026-27 (T-4), 2025-26 (T-4)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (7 components)
• CHP at a horticultural environment.
• CMU will be formed of multiple individual gas reiprocating engine units
• Energy from waste plant, the main components being a waste combustion section, heat recovery boiler, emissions clean-up unit and steam turbine/generator for the production of electricity
Active • 2024-25 (T-4), 2021-22 (T-4) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
Active • 2026-27 (T-4), 2024-25 (T-4) ...
River E Hydroelectric Generating Station, Gorthleck,Inverness IV2 6UL (2 components)

Hydroelectric run of river generating plant

Active • 2028-29 (T-4)
RG31 (42 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
61.07 MW
Postal Address: Dulyn Weir Hydro Station, Dulyn Weir, Near Conwy, LL32 8QE. Nearest post code to the actual hydro station: LL32 8SH. (2 components)
• Hydroelectric plant
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
Active • 2028-29 (T-4), 2024-25 (T-1)
PL7 (42 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
53.44 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
OI Manufacturing Alloa Kelliebank House, Glasshouse Loan, Alloa FK10 1NT, United Kingdom (25 components)
• Aberthaw 8 Coal fired
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
ME2 (24 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
61.07 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (32 components)
• 49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land north of the railway Line, Bellamour Lane, Wolsey Bridge  WS15 3JS (17 components)
• Component has yet to be procured.
• Gas peaking reciprocating engine
• N/A
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations