RWE GENERATION UK PLC

26 unique locations (104 components) - Page 1 of 2

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (3 components)

Aberthaw 7 Coal fired unit (2)

Inactive • 2021-22 (T-1), 2017-18 (T-1)
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• Load curtailment at site via standby generation (2)
• Load curtailment and standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
• Standby diesel generator that reduces site load when generating.
• Standby generation
• Standby generation from a POSGU.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (2 components)
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Inactive • 2023-24 (T-1), 2022-23 (T-3)
Cramptons Road Pumping Station, Cramptons Road, Sevenoaks, TN14 5BQ (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (7 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary …

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
King?s Lynn Power Station Willows Business Park Saddlebow Kings Lynn PE34 3RD (1 component)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2020-21 (T-4)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (1 component)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2018-19 (T-1)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (4 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (6 components)

Gas peaking reciprocating engine

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (9 components)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (2 components)

Hythe Power Station - Auxiliary load behind boundary meter

Inactive • 2017-18 (T-1)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (2 components)

Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter

Inactive • 2017-18 (T-1)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (7 components)
• CMU will be formed of multiple individual gas reiprocating engine units
• Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter
Inactive • 2020-21 (T-4), 2017-18 (T-1)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

Inactive • 2017-18 (T-1)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

Inactive • 2020-21 (T-4), 2017-18 (T-1)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive • 2022-23 (T-4)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083

Inactive • 2020-21 (T-1)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (7 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...