SSE ENERGY SUPPLY LIMITED

6 unique locations (78 components)

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (9 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 6 x reciprocating engines
• A Battery Energy Storage System.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land off Main Road, Weston, CW2 5LD (2 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (16 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Two gas CHP in a horticultural environment with no aux load
Active • 2025-26 (T-4), 2024-25 (T-4) ...
THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 6 locations