Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE ENERGY SUPPLY LIMITED

125 unique locations (941 components) - Page 6 of 13

HIGH STREET WESTONING BEDFORD MK45 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Hillside West, Hutton, Weston-super-Mare, Somerset, BS24 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Humbly Grove Energy Ltd, Weston Common, The Avenue, Lasham, The Avenue, Alton Hants, GU34 5SY (1 component)

On-site gas turbine back-up generation which can either reduce site import consumption or export to the grid (via a separate MPAN)

Active • 2025-26 (T-1)
Humbly Grove, Weston Common, The Avenue, Lasham, Alton, Hants, GU34 5SY (2 components)

On-site back-up generation which reduces site consumption and exports excess to distribution network

Active • 2027-28 (T-4), 2024-25 (T-1)
IRONS WAY, WEST WICK, WESTON-SUPER-MARE, BS24 (8 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Kay Weston Newbury Berkshire RG20 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Kent Avenue West Wick Weston-Super-Mare BS24 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
KENT AVENUE WEST WICK WESTON-SUPER-MARE BS24 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (12 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.62 MW
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.05 MW
Loading map...
Showing 10 locations