SSE ENERGY SUPPLY LIMITED

12 unique locations (65 components) - Page 1 of 2

Asda Bristol CDC Distribution Centre, St Andrews Road, Kings Weston Lane BS11 9FG (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Clayhill Farm, Greenfield Rd, Westoning, Bedfoird, MK54 5JD (near MK45 5AD) (1 component)

44MW Storage consisting of 11 x 4MW units

Inactive • 2020-21 (T-4)
Coleridge Rd, Weston-super-Mare BS23 3UW (6 components)

Diesel and/or gas reciprocating engines.

SSE ENERGY SUPPLY LIMITED Not Prequalified BS23
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Court North Lane Weston-On-The-Green BICESTER OXFORDSHIRE OX25 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Land off Main Road, Weston, CW2 5LD (3 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
PLESHEY CLOSE WESTON-SUPER-MARE BS22 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
TBA (23 components)

Unproven DSR Component

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...