Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE GENERATION LIMITED

12 unique locations (125 components)

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
2600 John Smith Drive, Oxford, OX4 2JY (37 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Chelmsley Wood, 341 Bosworth Drive Chelmsley Wood B37 5EX (7 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Dyce, River View Drive , Aberdeen, AB21 7NG (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8BL (8 components)

1 x hydro turbine & synchronous generator

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Glenmoriston Power Station, Fort Augustus, Inverness, IV63 7YH (11 components)
• Gensets 1 & 2
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
• Livishie Hydro Generation Genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Luichart Power Station, Contin, Strathpeffer, IV14 9EW (8 components)
• Hydro Generation Gensets 1 & 2
• ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Netherton Farm, Keith AB55 5PE (12 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 12 locations