Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE UTILITY SOLUTIONS LIMITED

5 unique locations (35 components)

Active MW: 5464.99 MW
Inactive MW: 11739.72 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (1 component)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Active • 2026-27 (T-4)
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (2 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..

Active • 2026-27 (T-4), 2027-28 (T-4)
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (3 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.

Active • 2026-27 (T-4), 2027-28 (T-4)
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (18 components)
• 6 x reciprocating engines
• Aux. load separately metered
Active • 2022-23 (T-3), 2022-23 (T-4) ...
Loading map...
Showing 5 locations