Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE ENERGY SUPPLY LIMITED

9 unique locations (558 components)

Avon Close, Weston-Super-Mare, BS23 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Bridwell Road, Weston Mill, Plymouth, Devon, PL5 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Daley Close, Weston-super-Mare, Somerset, BS22 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Hillside West, Hutton, Weston-super-Mare, Somerset, BS24 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Humbly Grove Energy Ltd, Weston Common, The Avenue, Lasham, The Avenue, Alton Hants, GU34 5SY (1 component)

On-site gas turbine back-up generation which can either reduce site import consumption or export to the grid (via a separate MPAN)

Active • 2025-26 (T-1)
N/A (548 components)
• DSR components shall be assigned prior to the start of the Delivery Year.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. …
• bus depot site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
456.92 MW
Snowdon Vale, Weston-super-Mare, Somerset, BS23 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
The Street, Coney Weston, Bury St. Edmunds, IP31 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Weston Close, Upton Grey, Basingstoke, RG25 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Loading map...
Showing 9 locations