Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE GENERATION LIMITED

12 unique locations (217 components) - Page 1 of 2

Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (34 components)
• 1 x hydro turbine & synchronous generator
• Pre-refurbishment generating unit 1: single hydro turbine & synchronous generator
• Tummel unit 2 for 2017/18 delivery year only
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.94 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (37 components)

1 x hydro turbine & synchronous generator

Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.04 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (20 components)
• Peterhead 1
• Peterhead CCGT
• Peterhead CCGT for Delivery Year 2018/19 only
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2122.97 MW
Luichart Power Station, Contin, Strathpeffer, IV14 9EW (8 components)
• Hydro Generation Gensets 1 & 2
• ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.94 MW
Lochay Power Station, Killin, Stirling, FK21 8UA (23 components)
• Genset 1.
• Genset 2.
• Hydro Generation Unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
362.58 MW
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (13 components)
• 1 x hydro turbine & synchronous generator (2)
• 1x hydro turbine & synchronous generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.80 MW
Glenmoriston Power Station, Fort Augustus, Inverness, IV63 7YH (11 components)
• Gensets 1 & 2
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
• Livishie Hydro Generation Genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
130.93 MW
Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT (25 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
228.42 MW
Deanie Power Station, Kiltarlity, Beauly, IV4 7JX (16 components)
• Deanie Unit 1
• Deanie Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.58 MW
Cluny Drive Newton Mearns Glasgow Lanarkshire G77 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 10 locations