SSE UTILITY SOLUTIONS LIMITED

17 unique locations (298 components)

Active MW: 4908.04 MW
Inactive MW: 12296.67 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (71 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Duncombe Rd, Four Lane Ends, Girlington, BD8 8TB (10 components)
• 6 x reciprocating engines
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (47 components)
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-19' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-19) and TG1B and Unit 3 (which make up EMD-19). Gross 3 HH av. peak generation from TG1B on separate days = 49.863 MW At these three HH times, aux load on TG1B = -1.468 MW Net generation from TG1B = 48.394 MW
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)
• 12-turbine wind farm located in Scotland with the installed capacity of 43.200MW
• Energy facility comprising of reciprocating engine sets.
• The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)
• The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
• To be confirmed once CMU components are known
Active • 2026-27 (T-4), 2022-23 (T-4)
Greenfield Road, Westoning, Bedford, MK45 5JD (9 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 6 x reciprocating engines
• A Battery Energy Storage System.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (4 components)
• CHP Plant
• The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (58 components)
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Wind Turbine Generators x 15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)

A 20MW new build gas generating station..

Inactive • 2022-23 (T-3)
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (17 components)
• 4 x reciprocating engines
• A gas fuelled generating station.
• Existing Energy from Waste Plant
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
THATCHED COTTAGE WHITENAP LANE ROMSEY HAMPSHIRE SO51 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHED COTTAGE WORTLEY WOTTON-UNDER-EDGE GLOUCESTERSHIRE GL12 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHES SCHOOL LANE CHEARSLEY AYLESBURY BUCKINGHAMSHIRE HP18 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHES THE STREET PRESTON ST. MARY SUDBURY SUFFOLK CO10 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 17 locations